糖果派对

newsbanner
From January 31 to February 1, the inaugural conference and first academic meeting of the Carbon Footprint Professional Committee of the Chinese Society for Environmental Sciences was held in Nanjing, Jiangsu Province.
Recently, CNEPG signed a cooperation memorandum with Vietnam’s TUE and TY International.
From January 26 to 27, 2026, at the invitation of the Hong Kong Trade Development Council (HKTDC), CECEPHK participated in the Asian Financial Forum jointly hosted by the Government of the Hong Kong Special Administrative Region and the HKTDC.
Recently, the high-altitude ultra-high-voltage (UHV) test hall project in Xizang, for which CQEC’s Industrial Institute was responsible for the feasibility study and construction design, was officially put into operation.
On October 10, Liao Jiasheng, Chairman of CECEP, met with Wangdui, Vice Chairman and General Manager of Xizang State-Owned Capital Investment and Operation Co., Ltd., at CECEP headquarters.
Recently, the first hospital outpatient facility in China built using a Modular Integrated Construction (MIC) system, designed by the Shenzhen Machinery Institute Architectural Design under CQEC, was officially completed and put into operation at the original site of Shenzhen Longhua District Central Hospital.
Recently, CECEP Solar stood out among 58 participating companies in the 2025 Chongqing ESG Pioneer Enterprise Selection campaign and was named a Chongqing ESG Pioneer Enterprise.
Recently, Wind, a leading domestic ESG (Environmental, Social and Governance) rating agency, released its 2025 results, recognizing CECEP Guozhen’s outstanding ESG performance with an upgraded AA rating — a historic leap of two levels.
第  30  /  48  页  总条数: 237
【网站地图】
【网站地图】